BP to Shut West Chirag Platform for Maintenance

Friday, October 11, 2019
(Photo: BP)

BP said on Friday it would shut down its West Chirag platform in Azerbaijan for 15 days starting on Oct. 15 for planned maintenance.

"In accordance with the plan, production from the West Chirag platform will be suspended on 15 October for about 15 days to enable efficient maintenance, inspection and project work to be undertaken," BP-Azerbaijan said in a statement.

"During the turnaround, various flare and control systems upgrade projects will be implemented on the platform."


(Writing by Margarita Antidze; editing by David Evans)

Categories: Engineering Production Asia Inspection & Repair & Maintenance

Related Stories

Fire Contained at Vietnamese Oil Platform Undergoing Decommissioning (Video)

Fire Contained at Vietnamese Oil Platform Undergoing Decommissioning (Video)

Velesto’s Jack-Up Rig Set for Drilling Job off Indonesia

Velesto’s Jack-Up Rig Set for Drilling Job off Indonesia

ABS Greenlights SHI’s Multi-Purpose Deepwater LNG Floating Unit

ABS Greenlights SHI’s Multi-Purpose Deepwater LNG Floating Unit

Current News

Navantia Seanergies Delivers Second Substation Jacket for French OW Farm

Keyfield Ventures into Indonesia’s Oil and Gas Market with New Partner

EU: 44 Oil and Gas Firms Asked to Provide CO2 Storage Solutions

Norway Grants Permit for Equinor’s Drilling Plan in North Sea

Subscribe for OE Digital E‑News

Offshore Engineer Magazine