Technical consultancy NEL invests in development of new high pressure multiphase flow facility

OE Staff
Sunday, September 1, 2013

Technical consultancy NEL, a division of TÜV SÜD, invested US $767,700 in the development of a new high pressure multiphase flow facility at its Glasgow laboratories in the UK. The facility will operate at pressures up to 60 bar (equivalent to a subsea depth of 600m) to accurately reflect the increasing pressures at which flow meters must operate subsea. The new facility will be commissioned in 4Q 2013 fully operational by the end of the year.

Categories: Subsea

Related Stories

Jumbo Offshore Wraps Up Errea Wittu FPSO Mooring Pre-Lay in Guyana

Mubadala Hires SLB for Deepwater Drilling Services Offshore Indonesia

Aquaterra Energy Gets Multi-Year Well Intervention Job off Spain

Current News

Equinor Drills Dry Well in Barents Sea

Santos Posts 25% Profit Fall, Plans to Cut 10% of Jobs

Suriname, Guyana Plan Cross-Border Team for Join Gas Projects

Eco Wave Power Wraps Up Feasibility Study for South Africa’s Wave Project

Subscribe for OE Digital E‑News