Statoil to drill Mim with Deepsea Bergen

OE Staff
Wednesday, December 28, 2016

Statoil has received consent from Norway’s Petroleum Safety Authority (PSA) to drill exploration well 6507/3-12 on the Mim prospect in the Norwegian Sea.

Statoil is the operator for production licence 159B in block 6507/3 in the Norwegian Sea west of Sandnessjøen.

Water depth at the site is 381m. Drilling is scheduled to begin in early January 2017 and will last 27 days. A possible sidetrack from the well will take a further 18 days. 

The well is to be drilled by the Deepsea Bergen semisubmersible drilling facility owned and operated by Odfjell Drilling. The facility is an Aker H-3 type, built in 1963. It is classified by DNV GL and registered in Norway.

Categories: Exploration Europe Vessels Drilling

Related Stories

DEME Set for Monopiles, Cables Installation Job at Polish Offshore Wind Farm

Equinor, Partners Okay $395M Johan Castberg Tie-Back Scheme

Solstad Scoops $25M in New CSV Contracts in Brazil and North Sea

Current News

DeepOcean Awarded IMR Contract Extension by Equinor

BOEM Initiates Process for Potential Mineral Lease Sale Offshore Virginia

Jumbo Scoops Two Offshore Wind Contracts

Wood Nets Long-Term Maintenance Contract for Rio Grande LNG Facility

Subscribe for OE Digital E‑News