Latest News - page 2497


Sinopacific enters Mexican market

Aug 06, 2014

Sinopacific Shipbuilding Group has been contracted by Mexican shipping company Naviera Petrolera Integral to construct three SPP17A offshore support vessels (OSV), marking the Chinese company’s first foray into the Mexican market. The vessels…

Halliburton appoints Miller President

Aug 06, 2014

Jeffrey A. Miller has been promoted to president  of Haliburton and also joins the Board of Directors, effective 1 August 2014.  In this new role, Miller will complement the leadership of Dave Lesar, Halliburton’s chairman and chief executive officer…

Shell produces first oil at Bonga North West

Aug 06, 2014

Shell Nigeria Exploration and Production Company Ltd. (SNEPCo) began oil production from the first well at the Bonga North West deepwater development, off the Nigerian coast, approximately 120km offshore the Gulf of Guinea, on 5 August. Oil…

Oman offers offshore blocks

Aug 06, 2014

Oman's Ministry of Oil & Gas (MOG) has announced an oil and exploration bid round which includes two blocks offshore. The two offshore blocks 18, 59 are being opened to bidders alongside onshore blocks 43A, 54, 58.  Block 18 is in…

North Sea optimism falls

Aug 06, 2014

Oil & Gas UK's Q2 2014 Business Sentiment Index has revealed that industry optimism has fallen for the fifth consecutive quarter, but remains positive, just, at two points above zero on the -50 to +50 index. The industry body described…

Marathon spuds Key Largo

Aug 06, 2014

Marathon Oil is due to spud an exploration well on the Key Largo prospect, on Walker Ridge Block 578, Gulf of Mexico, in Q3. It will be the first well drilled with a new-build deepwater drillship. Marathon Oil is operator and holds a 60% working interest in the prospect…

TGS announces GOM campaign

Aug 06, 2014

TGS is to start Snipe Phase 52, a new long-offset 2D multi-client survey in the ultra-deep water, US Central Gulf of Mexico in Q3 this year. The survey, which will take about 100 days, will include 12,000km of data exending to the US-Mexico international boundary…

Lundin spuds Barents well

Aug 06, 2014

Lundin Petroleum has announced a successful initial appraisal campaign offshore Malaysia and the start of drilling on a new exploration well in the Barents Sea.  The Barents well is exploration well 7220/11-1 in PL609 in the Norwegian sector of the Barents Sea…

EPA lifts W&T Offshore suspension

Aug 05, 2014

The US Environmental Protection Agency (EPA) lifted a suspension and proposed debarment and removed the statutory disqualification imposed on Houston-based explorer W&T Offshore, the company announced on 5 August 2014. US EPA Administrator Gina McCarthy…

Chevron quits Anchor-1 well

Aug 05, 2014

Chevron’s Anchor-1 well was junked due to mechanical difficulties. Located in Green Canyon block 807, 131 mi. from Louisiana in the Gulf of Mexico, Anchor-1 was abandoned before reaching its geologic objectives, according to Cobalt International Energy’s 2Q 2014 results…

Intelligent manufacturing systems

Aug 05, 2014

As offshore platforms are automated from top to bottom, and integrators stitch together disparate systems and protocols into a smoothly-running continuum, the inevitable next step will be assimilation of the performance data with onshore management systems…

LQ platform topsides arrive at Filanovsky field

Aug 05, 2014

The living quarters platform (LQP-1) topside for the Vladimir Filanovsky field has arrived at its north Caspian Sea destination from Krasnye Barrikady shipyard in Russia’s Astrakhan region, the Russian Maritime Register of Shipping (RS) announced on 5 August…

STATS opens UK facility

Aug 05, 2014

Left: Martin Wilson; Right: Dr. Mark Burton The Aberdeenshire-headquartered STATS Group opened a new intervention engineering and technical support hub and recruited two pipeline intervention services team members…

Tomax drilling jet impact

Aug 05, 2014

Norwegian drilling technology specialist Tomax released a video from an internal research program with recordings of the actual pressure impact from the drill-bit nozzles.  The video gives an insight to a “blind-zone” that is often critical for pressure-sensitive deepwater operations.

Petrofac to manage GDF assets

Aug 05, 2014

GDF Suez E&P UK has renewed its Integrated Services Contract (ISC) with Petrofac.  The contract covers operations, maintenance and engineering services support to GDF SUEZ E&P UK throughout its operations in the UKCS, including Cygnus, the…

Current News

Thistle Wind Partners Submits Plans for Bowdun Offshore Wind Farm

Seatrium Gets Repeat Order from IMI for Arabia 4 Jack-up Rig

Sea Lion Oil Project in Falkland Islands Gets Green Light

ABB’s Streamlined DP2 System Passes Sea Trials on DEME’s Norse Wind WTIV

Subscribe for OE Digital E‑News