Asgard subsea template sets sail

Aker Solutions loaded out the 1800-tonne subsea gas compression station steel frame from its yard at Egersund. In the next two weeks it will be installed using the crane vessel Saipem 7000 in 300m water on the seabed at the Statoil-operated Åsgard field.

Read more about the Asgard project here.

Current News

Talos Energy Makes Leadership Team Changes

Talos Energy Makes Leadership

SOVs – Analyzing Current, Future Demand Drivers

SOVs – Analyzing Current, Futu

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Equinor Cleared for Drilling O

Skanska Set for South Brooklyn Marine Terminal Buildout

Skanska Set for South Brooklyn

Subscribe for OE Digital E‑News

Offshore Engineer Magazine