Latest News - page 2207

 

Woodside, Kogas in partnership renewal

Apr 11, 2016

Australia’s Woodside Energy and Korea Gas Corp. (Kogas) entered into a memorandum of understanding (MOU) to renew a partnership that has been in place since 2011. The MOU, signed by Woodside CEO Peter Coleman and Kogas president and CEO Lee Seung-Hoon…

Mubadala to spud Sri Trang-1, off Thailand

Apr 11, 2016

Mubadala Petroleum is set to commence drilling operations at the Sri Trang-1 exploration well in mid-May, offshore Thailand.  The well is approximately 18km north-northeast of the Manora oil development, in the Gulf of Thailand and within the G1/48 concession…

GE starts on HPHT Prelude flexibles at Newcastle

Apr 11, 2016

GE Oil & Gas has started production of four high-pressure, high-temperature (HP/HT) dynamic flexible risers destined for the world’s largest floating liquefied natural gas (FLNG) facility, Prelude, to be operated by Shell, located 250km off the coast of Western Australia…

DNV GL launches leak detection RP

Apr 11, 2016

DNV GL has now launched the first globally applicable guidance for leak detection systems for offshore fields. The challenge for oil and gas operators is to have a leak detection system that is reliable and capable of detecting leaks…

Montrose topsides sail out

Apr 11, 2016

Talisman's new Montrose bridge linked platform (BLP) topsides has sailed out from the Heerema Fabrication Group's Zwijndrecht yard, 12mi south of Rotterdam.  The 10,500-tonne, 75m-long, 40m-high, topsides will make a short stop off at Schiedam…

Mixed results on BEL-1 for Cairn

Apr 11, 2016

UK-based explorer Cairn Energy has met with mixed results on its latest exploration well offshore Senegal. The BEL-1 well, drilled in 1031m water depth to 2767m total vertical depth, was targeting the Bellatrix exploration prospect and appraising the northern extent of the SNE field…

Cross Group completes GoM subsea well intervention

Apr 08, 2016

The Cross Group has successfully completed subsea live well intervention operations on three TFL (through-flowline) template wells in the US Gulf of Mexico using its 3-1/16in 10,000 psi subsea convertible live well intervention package in 1800ft of water…

PSA: COSL rig not built for big waves

Apr 08, 2016

Norway’s Petroleum Safety Authority (PSA) has revealed in its investigation of a fatality aboard the COSL Innovator, that the rig was not built to endure weather conditions that occurred on the night of 30 December, however, COSL Drilling Europe conducted its own heavy-hitter investigation…

Eni expands HAL software adoption

Apr 08, 2016

Eni has expanded the adoption of Halliburton Landmark’s DecisionSpace Geosciences across its exploration business units worldwide. Eni decided to expand the utilization of Landmark’s solution in order to improve efficiency through integration and cross-disciplinary collaboration…

Archer wins COP Norwegian contract

Apr 08, 2016

Archer has been awarded a five-year contract by ConocoPhillips for the provision of mechanical wireline services for the Norwegian Continental Shelf. The contract was awarded following a competitive tender process for ConocoPhillips’ well intervention services in Norway…

Wood Group acquires Ingenious

Apr 08, 2016

Wood Group has acquired Ingenious Inc., a supplier of proprietary software and consulting services to the global chemical, oil and gas, and energy industries. The acquisition provides a manufacturing operations management systems capability…

Noble fails at Silvergate, moves to Katmai

Apr 08, 2016

Noble Energy will plug and abandon its Silvergate prospect after failing to encounter commercial hydrocarbons in the Gulf of Mexico, and will move to drill an appraisal well at its Katmai discovery.   Noble will move to drill at Katmai…

PGS to survey Aasta Hansteen area

Apr 08, 2016

In May 2016, PGS will commence acquisition of a 4400sq km 3D GeoStreamer survey over the Aasta Hansteen area of the Norwegian Sea, scheduled to be completed in August 2016. Fast track data will be available four months after the final shot…

Tullow delays Jubilee restart

Apr 08, 2016

Tullow Oil is pushing back the start up of production at its Jubilee field offshore Ghana by an additional two weeks, after finding more damage to the Kwame Nkrumah floating production and storage offloading (FPSO) unit. Image of the Kwame Nkrumah…

Island lands BP well intervention work

Apr 08, 2016

Island Offshore's mobile offshore unit Island Constructor has been awarded a contract by BP Exploration Operating Co. for the provision of light well intervention services on the UK continental shelf in July this year.  According to the terms of the agreement…

Current News

Guyana Opposes Venezuela's Claim on Oil-Rich Esequibo Region

Guyana Opposes Venezuela's Cla

Trump Halts US Wind Farm Projects Citing National Security Risk

Trump Halts US Wind Farm Proje

Romanian Neptun Deep Black Sea Gas Project Begins to Lay Pipeline

Romanian Neptun Deep Black Sea

Equinor Extends Drilling Agreements for Norwegian Continental Shelf

Equinor Extends Drilling Agree

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine