Noble Paul Romano spuds Malta well

Published

From Mediterranean Oil & Gas (MOG)Operator Genel Energy's Malta subsidiary Phoenicia Energy Co. announced on 30 May that the Noble Paul Romano deepwater semisubmersible drilling rig is moored on location and has commenced drilling Hagar Qim-1.

The well is being drilled in 1476ft of water in Block 7 of Area 4 off Malta, and is targeting 109 MMboe in Lower Eocene and Paleocene sands.

Total depth is expected to be reached in 2 to 3 months.

Hagar Qim-1 is the 11th well to be drilled offshore Malta and is the first exploration well since 2002.

 

Previous coverage:

Genel close to Malta drilling, 20 May 2014

Noble to drill Hagar Qim off Malta, 2 May 2014

Malta extension approved, 9 January 2014

Genel signs rig for Africa campaign, 1 May 2013

Current News

AF Offshore Secures North Sea Decom Job

AF Offshore Secures North Sea

Island Offshore’s Hybrid OECV Hits Water at Vard Yard in Romania (Video)

Island Offshore’s Hybrid OECV

Jumbo Offshore Wraps Up Errea Wittu FPSO Mooring Pre-Lay in Guyana

Jumbo Offshore Wraps Up Errea

Petronas Takes Operatorship of Oman’s Offshore Block 18

Petronas Takes Operatorship of

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine