TAM unveils LongCAP

TAM International unveiled its new 22-in. casing annulus packer, or LongCAP.

The new LongCAP was designed for a major international company and follows TAM’s recent design and qualification of a 22-in. port collar.

Together, the LongCAP and port collar offer operators improved cement integrity to meet higher well safety standards. TAM designed the 22-in. system for an international operator’s offshore project as the company continues to provide tailored solutions to its oil and gas customers.

The 22-in. LongCAP is ISO 14310 V6 qualified. The rigorous testing program involved multiple cycles of differential pressure reversals both from above and below the LongCAP packer set inside a 33-in. test fixture. The LongCAP element met or exceeded all test requirements. 

Current News

BP-Eni JV Azule Inks Deal for Namibia Offshore License

BP-Eni JV Azule Inks Deal for

NSTA Awards 31 More Licenses in Latest North Sea Oil and Gas Round

NSTA Awards 31 More Licenses i

Höegh LNG Strikes Deal to Deploy FSRU Hoegh Galleon in Egypt

Höegh LNG Strikes Deal to Depl

BW Offshore Concludes Sale of FPSO Polvo

BW Offshore Concludes Sale of

Subscribe for OE Digital E‑News

Offshore Engineer Magazine