Schlumberger, Golar form OneLNG JV

 

Golar LNG and Schlumberger have formed a new joint venture, OneLNG, to rapidly develop low cost gas reserves to LNG.

The combination of Schlumberger reservoir knowledge, wellbore technologies and production management capabilities, with Golar’s low cost FLNG (floating LNG) solution, will offer gas resource owners a faster and lower cost development thereby increasing the net present value of the resources, says the pair.

Golar and Schlumberger have 51/49 ownership of the joint venture. Golar and Schlumberger have agreed an initial investment commitment to cover the estimated equity needed to develop the first project. In addition, the parties will on a project-by-project basis discuss additional debt capital as required. This future financing will take into account Golar’s FLNG intellectual property through an equitable contribution mechanism to be agreed between the parties.

Golar Vice Chairman, Tor Olav Troim said: “Our new venture with Schlumberger provides a powerful union of their oilfield services technology and production management business, and our low cost FLNG solution. It leverages Golar’s LNG expertise, and builds upon our industry leading position as a midstream solutions provider.”

Schlumberger, President Operations, Patrick Schorn said: “This new joint venture is uniquely positioned to optimize the development of low cost gas reserves. The technology platform and production management capability that Schlumberger brings will enable a total system approach, leading to a simpler and fast-tracked FID process, and reliable operational execution for the benefit of the gas resource owners.”

OneLNG will be the exclusive vehicle for all projects that involve the conversion of natural gas to LNG, which require both Schlumberger Production Management services and Golar’s FLNG expertise. After reviewing the current market opportunities where 40% of the world’s gas reserves can be classified as stranded, both parties are excited at the future prospects of OneLNG and are confident that it would conclude 5 projects within the next 5 years.

Current News

Talos Energy Makes Leadership Team Changes

Talos Energy Makes Leadership

SOVs – Analyzing Current, Future Demand Drivers

SOVs – Analyzing Current, Futu

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Equinor Cleared for Drilling O

Skanska Set for South Brooklyn Marine Terminal Buildout

Skanska Set for South Brooklyn

Subscribe for OE Digital E‑News

Offshore Engineer Magazine