Latest News - page 2718

 

Aker wins mooring system supply

Jul 17, 2013

Aker Solutions won a contract to supply a complete Pusnes wire mooring system for a cylindrical-shaped accommodation unit being built at Cosco Nantong Shipyard in China. The equipment includes three triple wire winches, three control cabins…

Clariant opens R&D lab in Brazil

Jul 17, 2013

Clariant opened a new R&D Laboratory for Catalysts for Chemicals and Oil & Gas industries. Located in the company’s largest manufacturing plant of Latin America, in Suzano (Brazil), the laboratory begins operations with a complete infrastructure…

Shell's Olympus TLP arrives in Texas

Jul 16, 2013

Shell's Olympus tension leg platform (TLP) left Ingleside, Texas, for the Mars field in the US Gulf of Mexico earlier this week (July 13). But before the 120,000-ton facility set sail to its new home, this video from Shell captures the…

Rosneft commences study of Kara Sea

Jul 16, 2013

Rosneft, jointly with the RosHydroMet Arctic and Antarctic Research Institute, starts the large-scale program for comprehensive studies of the Kara Sea shelf as part of Kara Sea Summer 2013 Marine Expedition. The expedition was scheduled for July 12…

Quad 204 takes shape subsea

Jul 16, 2013

BP’s Quad 204 redevelopment will be one of the largest subsea developments in the UKCS. Quad 204 is one of the world’s biggest subsea redevelopment projects, and one of the most complex engineering challenges BP and its project partners have ever undertaken…

Oxy, Qatar Petroleum sign Qatari deal

Jul 16, 2013

Occidental Petroleum Corp. of Qatar (Oxy Qatar), and Qatar Petroleum signed a deal on the Phase 5 field development plan (FDP) regarding the Idd El Shargi North Dome (ISND) offshore Qatar. Both companies plan to maintain the field’s output of about 100…

Mooring line failures attract industry attention

Jul 16, 2013

Mooring lines on floating production systems continue to fail, costing the industry lost time and production— why and what is being done? Elaine Maslin reports. The use of floating production systems in the offshore oil and gas industry…

Aker Solutions acquires IDEAS

Jul 16, 2013

Glasgow, Scotland-based I.D.E.A.S. has developed software and technology that improves the quality and accuracy of integrity and life time analysis for oil and gas assets. The analysis can be applied in all phases of the development of an installation…

ALS to acquire Reservoir Group

Jul 16, 2013

ALS entered into an agreement to acquire Reservoir Group for US $533 million. Reservoir is a provider of oil and gas services and equipment that assists with the evaluation, development and optimization of oil and gas discoveries.  Reservoir operates five segments: Coring…

MCG begins Barents survey

Jul 16, 2013

MultiClient Geophysical (MCG) announced another long-offset multi-client 2D (MC2D) survey in the western part of the Norwegian Barents Sea. This survey is situated in the area southwest of the Bjørnøya (Bear Island) where blocks have been awarded in the 22nd concession round…

Gas find at Apache's Bianchi

Jul 16, 2013

Santos announced a gas discovery at the Bianchi-1 well in Retention Lease WA-49-R, located in the Carnarvon Basin offshore Western Australia.  Wireline logging and pressure testing has confirmed 112m of net gas pay between 4,748m,  and 5…

Fabricating an 8-leg launch jacket in record time

Jul 16, 2013

Using multiple work centers and close project management, L&T delivered the MNP jacket on schedule. Larsen & Toubro (L&T), India was awarded the Mumbai High North (MHN) process platform, living quarters, and process gas compressor module project by ONGC…

North Sea fabrication filling order books

Jul 16, 2013

A high level of fabrication activity in and around the North Sea is attracting new players. Elaine Maslin reports. Platform fabrication for new installations in North Sea will reach fever pitch this year as a historically high number of facilities are completed for load out…

Emergency Release Connectors designed for high bending moment

Jul 16, 2013

In the wake of the Macondo incident, the drilling industry has focused on making improvements to offshore safety and developing methods to recover from similar incidents. However, emergency release connector (ERC) technologies, which…

Case Study: ROV-deployed inspection of firewater pumps on a North Sea platform

Jul 16, 2013

Firewater pumps are crucial to the safe operation of platforms. Caissons protect the pumps from the harsh offshore environment and provide the transport route for firewater. Degradation of the caisson can render pumps ineffective; so it is…

Current News

Venterra Company, CAPE Holland, Awarded Contract for Fengmiao Offshore Wind Farm

Venterra Company, CAPE Holland

Bae Systems Launches Incubator Program to Propel Technologies Beyond Defense

Bae Systems Launches Incubator

DOF Group ASA Contract Award for Well Intervention Services in North America

DOF Group ASA Contract Award f

Jacket Loadout Milestone Completed for BorWin6 Offshore HVDC Platform

Jacket Loadout Milestone Compl

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine