Testing News

 

Peak gets two new ISO test facilities

Dec 17, 2014

Peak Well Systems (Peak) commissioned two new ISO test facilities in Perth (Western Australia) and Aberdeen (UK). The new facilities provide a controlled environment in which to test downhole plug systems under extreme conditions for prolonged periods of time…

Exova opens new Aberdeen facility

Nov 06, 2014

Testing, calibration and advisory services provider Exova Group has opened a new, purpose-built facility in Aberdeen in response to increasing demand for mission-critical testing in the oil and gas sector. Officially launched by Malcolm Webb…

ONS: Expro plans Norway expansion

Aug 24, 2014

Oilfield services company, Expro, plans to open a major new base in Tananger, Norway in summer 2015. The 19,000sq m facility will consolidate the company’s three current Stavanger area locations and house Expro’s Well Testing and Drill…

Success on fractured basement well

Jun 26, 2014

Fractured basement explorer Hurricane Energy has successfully completed the testing phase of its horizontal appraisal well in the Lancaster fractured basement oil discovery West of Shetland. The well will be suspended as a future producer…

Testing subsea BOPs to the limit

Apr 21, 2014

Maersk Drilling's Maersk Viking drillship. image source: Maersk Drilling Third party, hardware-int-the-loop (HIL) testing has been taken beneath the waves on a subsea MUX BOP. Elaine Maslin reports…

BSEE's Ohmsett facility receives $4 Million to improve infrastructure

Oct 24, 2013

New Jersey-based National Oil Spill Response Research and Renewable Energy Test Facility is one-of-a-kind in US. On 24 October 2013, US Secretary of the Interior Sally Jewell announced that the Bureau of Safety and Environmental…

Bexco launches test bench first

Sep 25, 2013

Synthetic rope manufacturer Bexco has invested in a new test bench facility capable of automated testing 25m lengths of rope for one week or longer, with remote electronic data interchange and on-site certification of made-to measure rope solutions…

Advances in bollard pull testing technology

Jul 30, 2013

Many arguments about the capabilities of a tug can be quickly settled when you can conduct a full-ahead power, bollard pull test. “Many captains will argue about horsepower, hull design, rudder angles, and other variables, but the only…

Tanzania discovery

Jun 17, 2013

BG Group completed a second drill stem test in Block 1 off Tanzania. The test was in the Mzia-2 well and flowed at a maximum rate of 57MMcfd. This is the first test of a Cretaceous reservoir in Tanzania’s deep water. Mzia-2 is 4km from the Mzia-1 discovery…

Deepwater tested

May 24, 2013

US-based Bluefin Robotic successfully tested its unmanned underwater vehicle (UUV) for the Defense Advanced Research Projects Agency (DARPA) in deepwater conditions, the company announced last month. Bluefin tested the UUV off Massachusetts with the Scarlett Isabella vessel…

Liner drilling test on Statfjord B

Apr 24, 2013

Statoil chronicles steerable liner drilling tests on its Statfjord and Brage oil fields in the North Sea.

Testing Times

Dec 09, 2012

Four independent testing rooms, an integrated command and control center, a core preparation laboratory, and an extensive perforated core analysis laboratory for post-test evaluation are among the facilities at Halliburton’s new state-of…

Multiphase move

Aug 17, 2012

Norwegian multiphase meter manufacturer MPM has opened a new hyperbaric facility at its Forus, Stavanger, plant that will enable it to test its subsea systems for 4000m water depth rating. The company, which started up in 2003 and notched up revenues of NKr230 million last year…

Proserv

Apr 28, 2012

Proserv has opened a new facility in Aberdeenshire for subsea system integration testing, factory acceptance tests, tree assembly and BOP re-certifications.

Raising the test rig stakes

Aug 01, 2011

Ever-alert to the need to hone its competitive edge, the drilling technologies business unit of Aker Solutions is looking to take its service offering to an unrivalled level of sophistication with the new drawworks extended test facility in Erkelenz…

Current News

Talos Energy Makes Leadership Team Changes

Talos Energy Makes Leadership

SOVs – Analyzing Current, Future Demand Drivers

SOVs – Analyzing Current, Futu

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Equinor Cleared for Drilling O

Skanska Set for South Brooklyn Marine Terminal Buildout

Skanska Set for South Brooklyn

Subscribe for OE Digital E‑News

Offshore Engineer Magazine