BG Group completed a second drill stem test in Block 1 off Tanzania. The test was in the Mzia-2 well and flowed at a maximum rate of 57MMcfd. This is the first test of a Cretaceous reservoir in Tanzania’s deep water. Mzia-2 is 4km from the Mzia-1 discovery, in 1620m of water about 45km off the coast of southern Tanzania.