InterMoor completes Juniper installation work

InterMoor completed its role in the largest foundation installation project offshore Trinidad and Tobago to date. The final stage of the project involved hooking up Diamond Offshore Drilling Inc.’s Ocean Victory semisubmersible drilling rig to the preset mooring spread InterMoor had previously installed. This step marks the completion of InterMoor’s mooring and foundation installation campaign for BP Trinidad and Tobago’s (bpTT) Juniper gas project. 

The hookup took less than four days and required 14 InterMoor personnel offshore, including rig coordinators and superintendents, riggers and engineers aboard the UOS Pathfinder anchor-handling vessel.

Before the hookup, InterMoor successfully completed a contract with bpTT, which included the initial design of a mooring system, the fabrication of driven piles and the installation of a preset mooring spread. InterMoor designed and fabricated eight piles (1.2m in diameter by 39m long) at its facility in Morgan City, USA, and provided offshore project management services for the mooring preset campaign. This included installing the driven piles using H-links and 300m of ground chain per leg from the Boa Deep C construction vessel. The Juniper project was carried out in a water depth of 100m with strong water currents.

The mooring solution engineering began in 2011 and offshore installation was completed in early November 2014. The hookup was completed in May 2015.

Image: View of Ocean Victory/Intermoor

Current News

Decarbonization Offshore O&G: Navigating the Path Forward

Decarbonization Offshore O&G:

US Offshore Wind: Outlook Strong Despite Construction Productivity Issues

US Offshore Wind: Outlook Stro

Bourbon Orders Exail Tech to Streamline Subsea Fleet’s Services for Offshore Energy

Bourbon Orders Exail Tech to S

Asso.subsea Wraps Up Subsea Cables Installation at French Floating Wind Pilot

Asso.subsea Wraps Up Subsea Ca

Subscribe for OE Digital E‑News

Offshore Engineer Magazine