IHC launches new pipelay vessel

Sapura Topazipo, new pipelay vesselIHC Merwede launched the new pipelaying vessel Sapura Topázipo (pictured) at its shipyard in Krimpen aan den IJssel, the Netherlands.

The naming of the fully integrated IHC Merwede vessel was carried out by Puan Sri Datin Seri Yazreen Yahya, spouse of Tan Sri Dato’ Seri Shahril Shamsuddin, President and Group CEO of SapuraKencana.

The 550t pipelaying vessel – ordered by Sapura Navegação Marítima, a joint venture between SapuraKencana and Seadrill – is the second in a series of five fully integrated offshore vessels, which will be completely designed, engineered and built by IHC Merwede. After delivery, the Sapura Topázipo is – like her sister vessel, the Sapura Diamante – destined to go to Brazil to develop oilfields in up to 2500m deep water for Petrobras.

The Sapura Topázipo will be equipped with a pipelaying spread designed by IHC Engineering Business. The vessel has two below-deck carousels capable of storing 2,500t and 1,500t of product. A vertical (tiltable) lay system, with a 550t top tension capacity, will be permanently installed for the deployment of a range of flexible products. The tower orientation allows for maximum deck space, while utilizing a high-capacity 610t abandonment and recovery (A&R) system. A custom-designed control system from IHC Drives & Automation integrates each aspect of the pipelaying spread.

“Two years ago, we signed a contract with Sapura Navegação Marítima for two pipelaying vessels,” said Arjan Klijnsoon, Managing Director of IHC Merwede’s Offshore division. “In August 2013, we signed another contract for a further three innovative vessels.  The construction and launch of the SAPURA TOPÁZIO is on schedule, which proves that we are a reliable partner for such complex vessels, particularly considering that all of the others are also on target.”

Name: Sapura Topázipo
Type: 550t pipelaying vessel
Customer: Sapura Navegação Marítima
Builder: IHC Offshore & Marine BV
Length overall: 145.9m
Breadth molded: 29.9m
Depth main deck: 13m
Draught (operational): 7.2m
Draught (max): 8.3m
Deadweight (operational): 7,025t
Deadweight (max): 10,070t
Accommodation: 120 people
 

Current News

PBS Extends Maintenance Contract with TotalEnergies for North Sea Assets

PBS Extends Maintenance Contra

Trident Energy Enters Congo’s Oil and Gas Sector with Chevron and TotalEnergies Deals

Trident Energy Enters Congo’s

Sintana Energy Expands Orange Basin Scope Offshore Namibia

Sintana Energy Expands Orange

Hess Sets Date for Shareholder Vote on Chevron Merger

Hess Sets Date for Shareholder

Subscribe for OE Digital E‑News

Offshore Engineer Magazine