Wood Group inks Utgard tieback work

Published

Wood Group has been awarded the detailed design scope of the subsea tie-back from the Utgard gas and condensate field to the Sleipner facilities, in the Norwegian North Sea.

The three-year, US$1million workscope is the first call off under the master service agreement (MSA) signed in May 2016, and will  be executed from Wood Group’s offices in Stavanger and Oslo.

The Utgard tie-back consists of a 21km long pipe-in-pipe production pipeline from the 4-slot template at Utgard to the Sleipner T platform and an integrated service umbilical (ISU) from the Sleipner A.

The contract builds on Wood Group’s support of the Utgard field development; earlier this year the company completed the front end engineering design (FEED) for the same project.

Robin Watson, Wood Group’s chief executive, said: “This further cements our strong global relationship with Statoil that is built on trust in our broad portfolio of capabilities and provision of innovative and diverse technical solutions.

“We are excited to continue our work on the next stage of the Utgard field development and will leverage our deep knowledge of the field and the Sleipner facilities, alongside our commitment to working collaboratively with Statoil to ensure success in effective and efficient delivery of this challenging subsea project.”

Illustration of Utgard, from Statoil.

Current News

Ndungu Full-Field Starts Up Offshore Angola

Ndungu Full-Field Starts Up Of

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

Norway's 2025 Oil Output Climb

AKOFS Offshore Inks New Vessel Deal with Petrobras

AKOFS Offshore Inks New Vessel

UK Trade Body Challenges Government View on North Sea Gas Decline

UK Trade Body Challenges Gover

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine