Offshore Software News - page 38

 

Making better sense of downhole data

Feb 02, 2011

Distributed temperature sensing data is now often the first port of call when identifying production issues, not the last resort as it had been prior to the adoption of the latest user-friendly data management packages. Tendeka's Garth Naldrett explains why…

Deeper, further, colder

Jan 02, 2011

Newly published Polar class vessel rules from French classification society Bureau Veritas are aimed at speeding Arctic and Caspian Sea oil and gas development by facilitating the building of tank, cargo and offshore service vessels which can operate unsupported by icebreakers in very heavy ice…

Forties field: an updatable full field model

Dec 31, 2010

The overhaul of the reservoir model of the giant Forties oilfield – from data management to full field simulation – is described here by operator Apache North Sea’s Jeffery Pyle and Schlumberger’s Gordy Shanor.Production from the Forties field began in 1975…

McDermott team strikes gold

Dec 31, 2010

McDermott picked up a Bentley Systems innovation in construction award at the infrastructure software provider’s recent ‘Be Inspired’ gathering in Amsterdam for the early delivery of the Su Tu Vang central processing platform at the Cuu Long project offshore Vietnam…

Tidying up on Trym

Nov 01, 2010

Aker Solutions has started a six-month integrated operations pilot with Danish operator Dong on the Trym field, an industry briefing in London heard recently. Meg Chesshyre reviews the status of this and other developments on the Aker technology horizon…

How to improve plate mudmat design efficiency and quality

Oct 26, 2010

Prompted by practical engineering needs, Foster Wheeler Upstream developed a design tool to facilitate the design of subsea plate mudmats. Dr Jinming Xu, Paul Schank and Ray Young discuss how Mudmatician, through automation and built-in intelligence…

Products in action - OE October 2010

Oct 26, 2010

Quicker connection Baker Hughes announced the commercialization of its Reconnect technology, which the company says provides an alternative for re-establishing surface hydraulic control to surface-controlled subsurface safety valves (SCSSVs)…

Dropping downtime

Oct 26, 2010

Another drilling contractor, Seadrill, recently put to the test DNV’s new standard for managing integrated software dependent systems. Wendy Laursen assesses the system’s scope for reducing software-related downtime on drilling units.There are…

Products in action - OE September 2010

Sep 01, 2010

Fracturing fluid additivesRelease of the new OpenFrac family of hydraulic fracturing fluid additive systems was announced by Schlumberger last month. The additive systems can be used for fracturing-stimulation treatments, including applications in challenging…

Opening the window

Aug 09, 2010

Weather is a major factor when planning offshore drilling campaigns. Asbjørn Stålesen of FMC Technologies says the company's Real Time Operating Limits system has allowed it to increase the time available for carrying out drilling work.The biggest…

The book of Xodus

Jul 09, 2010

The Xodus Group has achieved rapid growth since its three founding directors set it up as an independent consultancy in 2005. Now an international company, its employee base numbers 200 in the UK and 70 in Australia. Turnover in the 12 months to September 2009 was around £24 million…

Dealing with data

Jul 09, 2010

By automating the process of data analysis and optimisation, downhole monitoring and completions specialist Zenith Oilfield Technology says its Z-Sight tool facilitates better management of the high volumes of data associated with artificially lifted wells…

Products in action - OE July 2010

Jul 09, 2010

New view for crane operatorsClaxton's new EEx-rated crane boom rig camera helps rig crane operators monitor the area beneath the crane boom, where loads can often be moved into 'blind' areas not visible from the crane's cab.Claxton, an Acteon company…

Trouble time

Jul 09, 2010

For a while, non-productive time was a problem most companies didn't want to acknowledge. Two recent reports have brought into focus the amount of time, and money, lost due to non-productive time. Jennifer Pallanich finds out what the Athens…

Time under the microscope

May 20, 2010

Non-productive time (NPT) associated with control systems software and hardware integration remains a significant drain on high-spec offshore asset costs, according to a study released last month.The study, by the Athens Group and ModuSpec,…

Current News

Shell Pivots Back to Oil to Win Over Investors - Sources

Shell Pivots Back to Oil to Win Over Investors - Sources

Island Offshore Bags Offshore Mooring Work in Mediterranean Sea, Gulf of Mexico

Island Offshore Bags Offshore Mooring Work in Mediterranean Sea, Gulf of Mexico

Partners Developing Solution for CTV Electrification Refits

Partners Developing Solution for CTV Electrification Refits

Gumbs to Step Down as President and CEO of Bosch Rexroth North America

Gumbs to Step Down as President and CEO of Bosch Rexroth North America

Subscribe for OE Digital E‑News

Offshore Engineer Magazine