Skarv start-up

Published

BP is celebrating production from the Skarv field in the Norwegian Sea. CEO Bob Dudley called the start-up a “key operational milestone” for the supermajor. The Skarv development includes an FPSO (pictured), five subsea drilling templates, and a 26in diameter, 80km-long gas export line connecting to the Gassled transport system. BP expects Skarv to hit peak production of 165,000boe/d by year-end.

Current News

AF Offshore Secures North Sea Decom Job

AF Offshore Secures North Sea

Island Offshore’s Hybrid OECV Hits Water at Vard Yard in Romania (Video)

Island Offshore’s Hybrid OECV

Jumbo Offshore Wraps Up Errea Wittu FPSO Mooring Pre-Lay in Guyana

Jumbo Offshore Wraps Up Errea

Petronas Takes Operatorship of Oman’s Offshore Block 18

Petronas Takes Operatorship of

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine