Noble drops Atwood rig from Leviathan project

Partners on the Leviathan gas project offshore Israel have opted to end a rig contract with Atwood Oceanics in favor of a cheaper deal. 

Operator Noble Energy had been due to drill the Leviathan 5 and 7 appraisal and production wells using the Atwood Advantage drillship, operated by Atwood. 

But, following a tender, and "significantly lower" rig rates offered elsewhere, the firm says it will now look to drill Leviathan 7 with another rig. 

Delek says the Leviathan 5 well is expected to be completed soon, after reaching the final depth planned and verification of the existence of natural gas in three layers of the Leviathan reservoir (Sands A, B and C).

As well as drilling the lower part of Leviathan 7 well, the new rig will also drill the lower part of the and Leviathan 3, as from Q1 2018, and will go on to complete the production drilling in the Leviathan project.

To date, the cost of the Leviathan 5 well and drilling the upper part of Leviathan 7 well, is expected to amount to US$ 106 million (100%), out of the total budget for these wells, as approved in the past by the Leviathan partners, of $148 million (100%).

Stage 1A development of the Leviathan development is on track for first gas by the end of 2019, says Delek.

Noble Energy is operator with 39.66% interest, with partners Delek Drilling (45.34%) and Ratio Oil Exploration (15%). 

Current News

Petrobras and BP Deepen Partnership

Petrobras and BP Deepen Partne

Subsea7 Wraps Up Pipeline Replacement Work Offshore Brunei

Subsea7 Wraps Up Pipeline Repl

Woodside Revenue Falls on Lower LNG, Oil Prices

Woodside Revenue Falls on Lowe

ABL Gets Neptun Deep Job for OMV Petrom in Black Sea

ABL Gets Neptun Deep Job for O

Subscribe for OE Digital E‑News

Offshore Engineer Magazine