VIDEO: 10,000-tonne Mariner topside lift

The first of eight topside modules, which will make up Statoil's Mariner platform, have been installed offshore Shetland in the UK North Sea.

The 10,000-tonne Mariner A utility module was lifted into place by the Saipem 7000 as planned. Now, seven more modules and a flare are being installed. 

Mariner is one of the largest projects currently under development on the UK Continental Shelf. 

Mariner is on the East Shetland Platform of the UK North Sea, about 150km east of the Shetland Isles. The heavy oil field has an estimated 250 MMbo with an average plateau production expected at about 55,000 b/d.

Image: Saipem 7000 lifting the Mariner utility module photo credit Jamie Baikie Signal2Noise Statoil

Read moreMariner ready for offshore lift, field could hold more

Current News

Oceaneering Signs On for Terradepth's Ocean Data Service

Oceaneering Signs On for Terra

US Oil and Gas Production Rebounds

US Oil and Gas Production Rebo

Macquarie Asset Management to Sell Stake in UK Offshore Wind Farm

Macquarie Asset Management to

SMD Invests £300K in Clean Energy

SMD Invests £300K in Clean Ene

Subscribe for OE Digital E‑News

Offshore Engineer Magazine