Umbilicals for Kizomba

Published

Oceaneering will supply 43km of electro-hydraulic, steel tube control umbilicals for Esso Exploration’s Kizomba Satellites Phase 2 development off Angola. The cables used at Bavuca and Kakocha fields will tie back to the Kizomba BFPSO, while cables used at Mondo South field will tie back to the Mondo FPSO. Manufacturing will begin 2Q 2013.

Current News

Ndungu Full-Field Starts Up Offshore Angola

Ndungu Full-Field Starts Up Of

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

Norway's 2025 Oil Output Climb

AKOFS Offshore Inks New Vessel Deal with Petrobras

AKOFS Offshore Inks New Vessel

UK Trade Body Challenges Government View on North Sea Gas Decline

UK Trade Body Challenges Gover

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine