C6 Technologies starts ComTrac field trials

C6 Technologies, an oilfield technology company offering new solutions for well intervention and conveyance utilizing composite materials, is performing field trials on its new ComTrac system after extensive test well runs.  

C6 Technologies – a joint venture by Archer Ltd. and IKM Group – currently has one ComTrac package onshore in the Middle East and another operated by Archer offshore in the North Sea, with several runs completed and further operations planned.

A ComTrac system package comprises a reel of a spoolable 12 mm diameter semi-stiff carbon composite rod with internal electrical conductors (up to 10 km in length), a control/spooling unit, and an injector unit and head that pushes or pulls the rod into or out of a well and provides well pressure control. 

The ComTrac system has several advantages over common intervention methods due to its unique features that include a low friction factor, the high tensile strength, and the capability of power and signal communication with downhole strings of the composite rod, coupled with the ability to enter pressured wells and the flexible constant-tension surface rig-up of the deployment system.

These features mean that the ComTrac system can provide logging, perforating, electro-mechanical intervention, and standard mechanical interventions in well depths and well conditions that other current rigless conveyance methods cannot. The surface deployment equipment features also remove the need for line-of-sight or sheave wheel rig ups and place the maximum tension point within the injector system, both to enhance operational safety.  

Finally, the design and specifications of the ComTrac system and components allow operation in offshore or onshore environments worldwide.

Current News

ABL Gets Neptun Deep Job for OMV Petrom in Black Sea

ABL Gets Neptun Deep Job for O

Petrobras and China’s CNCEC to Collaborate on Oil and Gas, Renewables

Petrobras and China’s CNCEC to

Norway Clears TGS and PGS Merger

Norway Clears TGS and PGS Merg

Full Capacity Operations at Tyra II Gas Development Up for Potential Delays

Full Capacity Operations at Ty

Subscribe for OE Digital E‑News

Offshore Engineer Magazine