TechnipFMC wins Fenja EPCI, SURF work

Published

VNG Norge, on behalf of the PL 586 partners, has issued a letter of intent (LOI) to TechnipFMC for the Fenja field development project (formerly known as Pil and Bue).

The LOI covers the EPCI (engineering, procurement, construction and installation) of the SPS (subsea production systems) and SURF (subsea structures, umbilicals, risers and flowlines) for the Fenja project in the Norwegian Sea, VNG Norge said.

The final contract will be signed pending a final investment decision planned for December 2017, and subject to the authorities’ approval of the plan for development and operations.

In June, VNG Norge submitted to Norway’s Ministry of Petroleum and Energy its US$1.3 billion (NOK$11.5 billion) proposed development plan for Fenja, previously known as Pil and Bue discoveries.

VNG Norge is operator of Fenja with 30% interest. Its partners are Point Resources (45%) and Faroe Petroleum Norge (25%).

Read more:

VNG Norge submits Fenja assessment

Current News

Ndungu Full-Field Starts Up Offshore Angola

Ndungu Full-Field Starts Up Of

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

Norway's 2025 Oil Output Climb

AKOFS Offshore Inks New Vessel Deal with Petrobras

AKOFS Offshore Inks New Vessel

UK Trade Body Challenges Government View on North Sea Gas Decline

UK Trade Body Challenges Gover

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine