Addax extends FPSO contract

Published

BW Offshore subsidiary Sendje Berge has agreed the terms of a contract extension for the floating production, storage and offloading (FPSO) vessel Sendje Berge with operator Addax Petroleum Exploration (Nigeria) for use on the Okwori field offshore Nigeria.

The contract extension will be for a four-year fixed term with two additional one-year extension options, starting 6 November 2017.

The revised and agreed commercial terms include a new day rate partially linked to oil production volumes and oil price. The termination notice announced on 5 May 2017 has been withdrawn and the arbitration has been settled as part of the agreed terms. 

The new terms have been submitted to relevant Nigerian Authorities for their review and approval. 

 
 

Current News

Equinor Drills Dry Well in Barents Sea

Equinor Drills Dry Well in Bar

Santos Posts 25% Profit Fall, Plans to Cut 10% of Jobs

Santos Posts 25% Profit Fall,

Suriname, Guyana Plan Cross-Border Team for Join Gas Projects

Suriname, Guyana Plan Cross-Bo

Eco Wave Power Wraps Up Feasibility Study for South Africa’s Wave Project

Eco Wave Power Wraps Up Feasib

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine