Production resumes at Tamar

Production has resumed at the Tamar gas field offshore Israel after a crack was found in an emission pipe used to release natural gas and pressure, according to partner Delek Drilling.

Noble was performing upgrade and improvement as planned, when the crack was found in the pipe, which is used routinely and in emergencies. Production was stopped on 21 September.

Today (28 September), Delek says Noble has completed a repair of the fault and production has resumed. Noble is continuing to carry out other planned upgrade works, says Delek. 

The Tamar field is in License 309 in the Matan Block, about 90km west of Haifa in the Levantine Basin. 

Noble Energy Mediterranean is the operator of the Tamar project with 32.5% stake. Partners include:  Isramco Negev 2 (28.75%), Delek Drilling (22%), Tamar Petroleum( 9.25%), Dor Gas Exploration (4%), and Everest Infrastructures (3.5%).

Read more:

Malfunction stops production at Tamar

Current News

Allseas Makes Progress on Santos’ Barossa Gas Export Pipeline in Australia

Allseas Makes Progress on Sant

HSM Rolls Out Topside for ONE-Dyas’ Offshore Wind-Powered Gas Platform

HSM Rolls Out Topside for ONE-

TechnipFMC Picks Up ‘Large’ Subsea Contract for ExxonMobil’s Whiptail Off Guyana

TechnipFMC Picks Up ‘Large’ Su

Kalypso, Royal IHC Partner to Build US' First Jones Act Cable Layer for Offshore Wind

Kalypso, Royal IHC Partner to

Subscribe for OE Digital E‑News

Offshore Engineer Magazine