Maersk Integrator to drill at Gina Krog

Statoil received consent from the Petroleum Safety Authority to use the Maersk Integrator jackup to drill and complete 14 new production wells at Gina Krog.

Gina Krog is an oil and gas discovery situated around 250km west of Stavanger and 30km northwest of the Sleipner A facility. Water depth at the site is about 110m. The development concept is a new steel platform and an oil storage vessel with a capacity of 850,000 bbl.

The field was proven in 1974. The reservoir contains oil and gas in Middle Jurassic sandstone in the Hugin formation.

Maersk Integrator is a jackup drilling facility, delivered by the Keppel Shipyard in Singapore in 2014. The facility will be operated by Maersk Drilling Norge.

Image: Maersk Integrator/Maersk Drilling

Read more

Gina Krog FSO ordered

Current News

US Plans 12 Offshore Wind Auctions Over Five Years

US Plans 12 Offshore Wind Auct

Equinor Wraps Up Hammerfest LNG Leak Repair, Maintains Friday Restart

Equinor Wraps Up Hammerfest LN

Namibia Targets First Oil Production from Venus Field in 2029/2030

Namibia Targets First Oil Prod

Second HVDC Platform Installed at World’s Largest Offshore Wind Farm

Second HVDC Platform Installed

Subscribe for OE Digital E‑News

Offshore Engineer Magazine