Eni's Goliat to restart production

Norway’s Petroleum Safety Authority (PSA) has granted Eni permission to restart production at its Goliat development after verifying the company has addressed electrical safety issues at the field.

Goliat FPSO Source: Eni

In October, PSA had ordered Eni to shut-in production after an audit revealed high fault rates for Ex motors of 38%; 3.5% of which represented serious faults in Eni’s own assessment. PSA ordered Eni to complete a systematic survey of potential ignition sources related to electric Ex motors. Eni also was ordered to implement the necessary technical, operational and organizational measures to reduce as much as possible the threat of ignition from all faults.

Eni, and partner Statoil met with PSA officials on 6 December to outline plans to bring the field back online. Based on the results of the meeting and PSA’s own verification and overall assessments, PSA says Eni has complied with the order.

Located in production licenese 229, Goliat is the first oil-producing field in the Barents Sea. The Eni-operated field includes 200 MMboe of resources and is being developed via a floating production storage and offloading unit. The field started production in March 2016 after several years of delays and 50% cost overruns. Goliat is located 85km northwest of Hammerfest and 50km southeast of the Snohvit field.

Read more:

Goliat shut down due to electrical issues

PSA issues new Goliat safety order

Barents spotlight

Current News

Oilfield Firm SLB's Profit Rises on International Drilling Demand

Oilfield Firm SLB's Profit Ris

Malampaya Gas Field Exceeds Export Capacity Amid Grid Demands in Philippines

Malampaya Gas Field Exceeds Ex

Petrobras and BP Deepen Partnership

Petrobras and BP Deepen Partne

Subsea7 Wraps Up Pipeline Replacement Work Offshore Brunei

Subsea7 Wraps Up Pipeline Repl

Subscribe for OE Digital E‑News

Offshore Engineer Magazine