VIDEO: Scarabeo 9 clearing Bosphorus Strait bridges

Saipem's Scarabeo 9 semisubmersible is in the Black Sea, where it is drilling one well, the Maria-1 exploration well in the Zapadno-Chernomorskaya license area, plus one optional well, in deepwater (more than 2000m water depth). 

To get there, it had to cross the Bosphorus Strait, passing under three Istanbul bridges. This meant that having to take apart part of the unit to clear the air draft. The rig had to be modified in advance in order that this could happen. 

The Scarabeo 9 is a semisubmersible unit equipped with a dual RamRig and a DP3 system.

The mobile offshore drilling unit (MODU) is an ultra-deepwater drilling unit, designed to operate in water depth up to 12,000ft, and with a drilling depth capacity up to 50,000 ft below the rotary table.

The MODU consists of two pontoons and four columns connected to the upper hull (deckbox). The pontoons are connected with four transverse braces attached at the lower part of the columns. The upper hull (deckbox) accommodates the drilling package and general utilities and it is equipped with a permanent accommodation module for 200 people. 

Current News

Bourbon Orders Exail Tech to Streamline Subsea Fleet’s Services for Offshore Energy

Bourbon Orders Exail Tech to S

Asso.subsea Wraps Up Subsea Cables Installation at French Floating Wind Pilot

Asso.subsea Wraps Up Subsea Ca

Dayrates Rise - Will More Energy Companies Buy Offshore Rigs?

Dayrates Rise - Will More Ener

MOL and Gaz-System Sing Long-Term FSRU Charter for New Polish LNG Terminal

MOL and Gaz-System Sing Long-T

Subscribe for OE Digital E‑News

Offshore Engineer Magazine