Statoil to remove Norne emergency response vessel

Statoil has received consent from Norway’s Petroleum Safety Authority (PSA) to change the emergency response vessel solution for the Norne field in the Norwegian Sea.

Norne is an oil and gas field in the Norwegian Sea, around 80km north of Heidrun. The field has been developed using a floating production storage and offloading (FPSO) unit tied to seven well templates.

To date, Norne has had its own emergency response vessel. In connection with a change to area response for Halten Nordland, Statoil has applied for consent to remove this vessel.

The area response for Halten Nordland is now covered by two vessels.

Current News

Argeo Lands Woodside Energy’s Calypso Survey

Argeo Lands Woodside Energy’s

Equinor's Hammerfest LNG Plant Evacuated Due to Gas Leak

Equinor's Hammerfest LNG Plant

Mocean Energy’s Blue X Wave Device and Verlume’s Halo Battery Come Ashore

Mocean Energy’s Blue X Wave De

Fugro’s Self-Elevating Platform On Call for Japan’s Offshore Wind

Fugro’s Self-Elevating Platfor

Subscribe for OE Digital E‑News

Offshore Engineer Magazine