Erin spuds Oyo-9 off Nigeria

Erin Energy started drilling the Oyo-9 well offshore Nigeria with the Pacific Bora sixth-generation drilling rig.

Pacific Bora. Image from Pacific Drilling.

The well is expected to take approximately 62 days to drill and complete. The tie-in of the well to the FPSO for production commencement is expected in the later part of Q4 2017. The well is expected to add an additional 6000-7000 b/d to the field’s current production.

The Oyo field is about 75km from the coast, ranging from 200-500m water depth. It is in OML 120, which Erin Energy holds 100% stake.

In June, Erin said it had expectations to double its production from Oyo, with the Oyo-9 well.

Read more:

Erin Energy to double production with Oyo

Current News

Talos Energy Makes Leadership Team Changes

Talos Energy Makes Leadership

SOVs – Analyzing Current, Future Demand Drivers

SOVs – Analyzing Current, Futu

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Equinor Cleared for Drilling O

Skanska Set for South Brooklyn Marine Terminal Buildout

Skanska Set for South Brooklyn

Subscribe for OE Digital E‑News

Offshore Engineer Magazine