PSA audits Goliat facility

From 30 January to 3 February 2017, the Petroleum Safety Authority Norway (PSA) carried out an audit of the planning and execution of work on hydrocarbon-carrying systems for Eni's Goliat facility.

The audit was a sub-activity of an audit series that will continue throughout 2017. The background to this sub-audit includes the seven hydrocarbon leaks that occurred in 2016.

The objective of the audit was to follow up on how Eni is managing risk associated with work on hydrocarbon-carrying systems, and how the compensatory measures implemented for this area are working.

The audit detected one non-conformity associated with knowledge of the status of safety systems.

In addition, improvement points were detected in connection with:

  • Management of competence for personnel with responsibilities and duties linked to hydrocarbon-carrying systems.
  • Dissemination of information
  • Procedures
  • Key locks on valves liable to be incorrectly operated.

Eni has been given a deadline of 12 May 2017 to report on how the non-conformity will be dealt with and how the improvement points will be assessed.

Current News

Malampaya Gas Field Exceeds Export Capacity Amid Grid Demands in Philippines

Malampaya Gas Field Exceeds Ex

Petrobras and BP Deepen Partnership

Petrobras and BP Deepen Partne

Subsea7 Wraps Up Pipeline Replacement Work Offshore Brunei

Subsea7 Wraps Up Pipeline Repl

Woodside Revenue Falls on Lower LNG, Oil Prices

Woodside Revenue Falls on Lowe

Subscribe for OE Digital E‑News

Offshore Engineer Magazine