Trio to FEED Pil & Bue

VNG Norge has awarded a trio of companies, Subsea 7, TechnipFMC, and Aker Solutions, front-end engineering and design (FEED) contracts for the Pil & Bue project, in the Norwegian Sea.

Subsea 7 and TechnipFMC won the subsea structures, umbilicals, risers and flowlines (SURF) portion of the deal; while the duo of TechnipFMC and Aker Solutions won the subsea production systems portion of Pil & Bue.

The FEED awards were based on a prequalification of tenderers, says VNG.

The studies will culminate in a design competition on which the contract for engineering, procurement, construction and installation (EPCI/EPC) will be awarded in Q4 2017.

Last month, VNG announced it plans to have a final investment decision for the project by the end of this year.

Pil and Bue, in PL 586, will be developed as a tie-back to the nearby Njord platform.

With total estimated resources of 90-200 MMboe. Pil is estimated to hold 7.5-14.9 MMcum of recoverable oil and condensate, and 3.7-5.9 Bcm of recoverable gas; while Bue has estimated resources of 1.5-2.6 MMcum of recoverable oil equivalent.

VNG is the operator with 30% stake. Partners include Faroe Petroleum (25%) and Point Resources (45%).

Read more:

Pil & Bue FID set for year-end

Pil & Bue to tieback to Njord A

Current News

ABL Gets Neptun Deep Job for OMV Petrom in Black Sea

ABL Gets Neptun Deep Job for O

Petrobras and China’s CNCEC to Collaborate on Oil and Gas, Renewables

Petrobras and China’s CNCEC to

Norway Clears TGS and PGS Merger

Norway Clears TGS and PGS Merg

Full Capacity Operations at Tyra II Gas Development Up for Potential Delays

Full Capacity Operations at Ty

Subscribe for OE Digital E‑News

Offshore Engineer Magazine