DONG Hejre jacket installation

DONG Energy released a video showing the installation of the Hejre jacket that occurred on 23 May 2014.

DONG Energy has installed the jacket for the Hejre platform in the Danish sector of the North Sea, 292km north west of Esbjerg, using Heerema Marine Contractor's Hermod heavy lift vessel

The 8400-tonne jacket arrived at its location, in 68m water depth, in the Danish sector of the North Sea on 22 May, and the last steel pile for fastening the legs of the support structure were rammed into the subsoil on Friday 30 May. Production well drilling is now due to start. First oil and gas is scheduled for 2016. 

Hejre is estimated to contain about 170MM boe. The reservoir is 5000-600m deep, at 1010 bar and 160°C.

Read more:

Hejre jacket installed

Hejre jacket sets sail

 

Current News

Aker Solutions Awarded Contract for BalWin2 Offshore Wind Project

Aker Solutions Awarded Contrac

Nigeria Introduces Oil Tax Relief for Cost-Cutting Measures Implementation

Nigeria Introduces Oil Tax Rel

Gazelle Secures Multi-Million Funding for Floating Wind Demo

Gazelle Secures Multi-Million

OMV Exits Ghasha Gas Project off UAE with Lukoil Stake Sale

OMV Exits Ghasha Gas Project o

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine