Hebron GBS time-lapse

In this video, Exxon shows a timelapse video of the construction of the Hebron gravity based structure (GBS), which took about five years to build. 

Exxon's  Hebron heavy oil project off Newfoundland and Labrador, Canada, sits in the Jeanne d’Arc basin about 350km southeast of St. John’s. 

Hebron will be produced through a gravity based structure (GBS), with 150,000b/d production capacity from 52 well slots, and about 1.2 MMbo storage capacity.

The field was discovered in 1980 and will become the fourth producing field in the province. It is estimated more than 700 MMbbl of recoverable resources will be produced from the field.

Current News

Talos Energy Makes Leadership Team Changes

Talos Energy Makes Leadership

SOVs – Analyzing Current, Future Demand Drivers

SOVs – Analyzing Current, Futu

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Equinor Cleared for Drilling O

Skanska Set for South Brooklyn Marine Terminal Buildout

Skanska Set for South Brooklyn

Subscribe for OE Digital E‑News

Offshore Engineer Magazine