Dudgeon heavy lift time-lapse

Published

In this video, Norwegian giant Statiol shows a time-lapse of the 1700-tonne heavy lift on the Dudgeon bank.

The Oleg Strashnov heavy lift vessel installed the substation for the Dudgeon offshore wind farm off Norfolk, UK. The substation will gather and transform the energy produced by the 67 turbines. Once complete, the wind farm will be able to provide renewable energy for 410,000 UK households.

Current News

Ndungu Full-Field Starts Up Offshore Angola

Ndungu Full-Field Starts Up Of

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

Norway's 2025 Oil Output Climb

AKOFS Offshore Inks New Vessel Deal with Petrobras

AKOFS Offshore Inks New Vessel

UK Trade Body Challenges Government View on North Sea Gas Decline

UK Trade Body Challenges Gover

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine