Join OEdigital on Facebook Join OEdigital on LinkedIn Join OEdigital on Twitter
 

Draugen subsea module heavy lift

Written by  OE Staff Monday, 06 June 2016 04:41

Heerema Marine Contractor's Thialf heavy lift vessel lifted the new subsea pump control module (PCM) onto Shell's Draugen platform offshore Norway late last month.

The 220-tonne control module is the topside part of the subsea pump system, which is planned to be commissioned later in 2016. The pump will boost production from the Draugen subsea wells. 

Read 2443 times