Post-Macondo efforts to improve well containment capabilities on both sides of the Atlantic moved into higher gear last month.In the US it was confirmed that Technip will handle front- end engineering and design of a proposed subsea well containment…
Aker Solutions has started a six-month integrated operations pilot with Danish operator Dong on the Trym field, an industry briefing in London heard recently. Meg Chesshyre reviews the status of this and other developments on the Aker technology horizon…
Mexico just registered its first Clean Development Mechanism with the United Nations under a collaboration between Pemex and Statoil to reduce gas flaring at the onshore Tres Hermanos oil field in Mexico. Statoil said 26 October 2010 the registration…
The pre-salt Tupi field may claim most of the interest when it comes to oil activity offshore Brazil, but plenty is going on along the large country's coastline. In the last two months, Petrobras has brought online two fields, updated its files…
Matthew Simmons, an energy investment banker and peak oil alarmist who in recent years was a strong advocate of renewable energy, died on 8 August at his home near Rockland, Maine. He was 67.In the 2005 book Twilight in the Desert: The Coming Saudi Oil Shock and the World Economy…
The risks associated with placing complex open hole completions across the reservoir are increasing. Deep Casing Tools’ Mark Presslie explains why and describes how a new tool assists the first-time placement of liners or completions.--Over the past two decades…
LOCH NESS SITING:AWS Ocean Energy began testing a 1/9th scale prototype of its new AWS-III wave energy device in Loch Ness. The device is a ring-shaped multi-cell floating power system that, at its full 60m-diameter scale, will be capable of generating up to 2…
Since Petrobras and its partners reported finding the large Tupi field in 2006, excitement has reigned over Brazil's pre-salt reserves. Opportunities exist, even in a changing regulatory environment: the Brazilian congress is poised to consider…
In October 2008, 37 years after its discovery, the Angel field began producing to a not-normally manned platform. In the ensuing 18 months, this platform offshore Western Australia has seen 98% uptime. Jennifer Pallanich discusses the A$1.6…
Operating in the marine seismic environment requires the ability to constantly adapt and chase down the opportunities. Andrew McBarnet describes how fortunes tend to favour the big rather than the brave.It’s business as usual’ has got to be something of a misnomer in commercial life…
Non-productive time (NPT) associated with control systems software and hardware integration remains a significant drain on high-spec offshore asset costs, according to a study released last month.The study, by the Athens Group and ModuSpec,…
The trend toward putting more and more production equipment on the seabed – and in increasingly deeper waters – strongly challenges the offshore construction industry to continuously improve their ability to perform such activities in a safe and cost-effective manner…
All energy industry eyes will be on Houston the first week of May, when the 41st annual Offshore Technology Conference gathers at Reliant Park. OE takes a look at what’s in store for delegates.The past couple of years have been tumultuous ones for the oil & gas industry…