Production Resumes at Claymore

(Photo: Repsol Sinopec)
(Photo: Repsol Sinopec)

Production at oilfields that contribute to the North Sea Flotta Gold crude grade has restarted following pipeline repairs, a spokesman for the terminal operator said.

Output was shut down in mid-May after a subsea valve on the pipeline from the Claymore gathering platform to the Flotta terminal in Scotland was found to be leaking hydraulic fluid.

"The situation has been temporarily resolved, pending further work being completed during our planned summer shutdown," the spokesman for Repsol Sinopec Resources UK added.


(Reporting By Julia Payne; Editing by Susan Fenton)

Current News

Wood Scoops TotalEnergies’ Decarbonization Job in North Sea

Wood Scoops TotalEnergies’ Dec

New Jersey Launches Fourth Offshore Wind Call

New Jersey Launches Fourth Off

MODEC Hires Seatrium for Errea Wittu FPSO Topsides Integration

MODEC Hires Seatrium for Errea

Aker BP Opts for Optime Subsea’s ROCS

Aker BP Opts for Optime Subsea

Subscribe for OE Digital E‑News

Offshore Engineer Magazine