Reservoir optimization under uncertainty

Published

Norway’s SPT Group is hailing the next-generation release of its reservoir flow model optimization solution, the newly launched MEPO4, as the industry’s first model for rigorous optimization under uncertainty.

Removing uncertainty is not possible, notes Stig Selberg, EVP reservoir optimisation at Oslo-based SPT, ‘but MEPO now enables geoscientists and reservoir engineers to understand and manage it better, to optimize development plans, drainage strategies and well targets even, with imperfect information’.

Since its first commercial release in 2004, MEPO has become an industry standard for automation and optimization of simulation workflows. As well as the uncertainty model, the latest version’s other new capabilities include a field management library to make it easier for engineers to optimize plateau length, well locations, well scheduling and production strategies.

The redesigned user interface and new 3D visualization technology (3DViz module) are expected to ‘significantly improve the understanding and analysis of different reservoir scenarios’, said Selberg, who sees MEPO4 ‘fast becoming the ultimate desktop application for all simulation projects targeting improved production, reservoir management and understanding of modeling and production uncertainties’.

Current News

Equinor Drills Dry Well in Barents Sea

Equinor Drills Dry Well in Bar

Santos Posts 25% Profit Fall, Plans to Cut 10% of Jobs

Santos Posts 25% Profit Fall,

Suriname, Guyana Plan Cross-Border Team for Join Gas Projects

Suriname, Guyana Plan Cross-Bo

Eco Wave Power Wraps Up Feasibility Study for South Africa’s Wave Project

Eco Wave Power Wraps Up Feasib

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine