Technip wins P-76 floater work

Technip worked on the Pazflor project offshore AngolaTechnip, leader of a 50/50 consortium with Techint, was awarded by PNBV a substantial contract for the topside construction and integration, the commissioning and start up assistance of the P-76 floating production storage and offloading (FPSO) unit.

Located in the Santos Basin pre-salt area offshore Rio de Janeiro, Brazil, this unit will produce 180,000 barrels of oil and 7 million cubic meters per day of gas.

Technip’s operating center in Rio de Janeiro will perform the project management, engineering and procurement. The 24,000-ton modules fabrication, integration and commissioning will be performed in Techint’s yard, in the South of Brazil. The project is scheduled to be completed by mid-2017.

José Jorge Araújo, Technip’s Senior Vice President Onshore Latin America and Offshore Brazil, declared: “We are delighted to have the opportunity to keep working with Petrobras.

"This contract strengthens furthermore our presence in the burgeoning Brazilian offshore pre-salt market, where our leading-edge position enables us to meet its high standards and requirements.

"We fully expect that our partnership with Techint will be a key to the success of the P-76 FPSO. Moreover, this project will contribute to the local economy as it will require approximately 70% of Brazilian local content.”

Current News

Liza Unity FPSO Hits Peak Output

Liza Unity FPSO Hits Peak Outp

Guyana's Cabinet Clears Oil Block Bid

Guyana's Cabinet Clears Oil Bl

Colombia's Ecopetrol Talking to Very Large Offshore Wind Players

Colombia's Ecopetrol Talking t

Australia Backs Long-Term Gas Exploration

Australia Backs Long-Term Gas

Subscribe for OE Digital E‑News

Offshore Engineer Magazine