Technip wins Egina flexi-pipe work

Published

Technip has been awarded two contracts to supply flexible pipes for Total's Egina field offshore Nigeria.

These contracts cover the qualification and supply of 12 dynamic flexible jumpers from 3.5" to 12.5" for oil production, gas lift, water injection and gas export, to connect the single top tension risers to the Egina floating production storage and offloading unit (FPSO). 

In addition, it covers two 20.5” unbonded flexible pipes as oil offloading lines (OOL), connecting the FPSO to the offloading buoy and associated ancillary equipment.

Flexi France, the group’s facility in Le Trait, will manufacture the flexible pipes which are scheduled to be delivered in 2015 for the jumpers and in 2016 for the OOL.

Earlier this month, Technip’s subsidiary DUCO was awarded a contract to supply umbilicals for the same project. 

Current News

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

Norway's 2025 Oil Output Climb

AKOFS Offshore Inks New Vessel Deal with Petrobras

AKOFS Offshore Inks New Vessel

UK Trade Body Challenges Government View on North Sea Gas Decline

UK Trade Body Challenges Gover

Inpex Secures Environmental Approval for Indonesia’s Abadi LNG Project

Inpex Secures Environmental Ap

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine