Filanovsky topsides work starts

Astrakhan’s Krasnye Barrikady shipyard has started constructing the living quarter platform (LQP-2) for the second stage of Vladimir Filanovsky field developed by LUKOIL in the Russian sector of the Caspian Sea.

The shipyard will construct two bearing blocks, the topside of the LQP and a catwalk bridge to connect the LQP-2 and the ice-resistant platform (IRP-2).

The LQP-2 will accommodate 55 people and include a helicopter pad.The LQP-2 is to be commissioned in the autumn of 2016.

Current News

Unique Group Celebrates 30 Years of Innovation

Unique Group Celebrates 30 Yea

Talos Energy Makes Leadership Team Changes

Talos Energy Makes Leadership

SOVs – Analyzing Current, Future Demand Drivers

SOVs – Analyzing Current, Futu

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Equinor Cleared for Drilling O

Subscribe for OE Digital E‑News

Offshore Engineer Magazine