McDermott installs single point mooring tower off Indonesia

Published

McDermott International has concluded the transportation and installation of a Yoke-type single point mooring tower and hook-up to a floating storage offloading (FSO) vessel for PT Rekayasa Industri offshore Indonesia in the Banyu Urip field. PT Rekayasa Industri was appointed by Mobil Cepu Ltd., an ExxonMobil subsidiary, as one of the engineering, procurement, construction and installation contractors for the field.

“PT Rekayasa Industri awarded the contract to McDermott earlier this year,” said Hugh Cuthbertson, Vice President and General Manager, Asia Pacific, for McDermott. “The McDermott Derrick Barge 30 undertook the mooring tower installation and hook up to the FSO, successfully completing the offshore campaign without any lost time incidents.”

The Yoke-type single point mooring tower is a critical component that enables mooring of the FSO unit at the site.

The Banyu Urip full field development is planned to produce 165,000bo/d from facilities that include 48 wells on three well pads, a central processing facility, and a 60mi pipeline to transfer the processed oil to a 1.7MMbbl FSO unit in the Java Sea.

Image: Derrick Barge 30/McDermott International

Current News

Ndungu Full-Field Starts Up Offshore Angola

Ndungu Full-Field Starts Up Of

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

Norway's 2025 Oil Output Climb

AKOFS Offshore Inks New Vessel Deal with Petrobras

AKOFS Offshore Inks New Vessel

UK Trade Body Challenges Government View on North Sea Gas Decline

UK Trade Body Challenges Gover

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine