Weatherford's Sakhalin project saved rig time

In late February, Weatherford completed a drilling and reaming project near Sakhalin Island, Russia, that resulted in a total of 52 hours in rig time saved.

The operator contracted Weatherford to enlarge a 3641ft (1110m) hole section from 8.5in to 9.5in on an offshore development well. Weatherford deployed a dual-reamer bottomhole assembly including a RipTide drilling reamer and a RipTide Rathole Killer drilling reamer. Radio-frequency identification (RFID) tags enabled both reamers to be opened and closed remotely and selectively throughout the run. This method allowed the crew to drill and ream the hole section to a total depth of 14,629ft (4459m), eliminate the rathole and clean the wellbore in a single trip.

By removing the need for a dedicated cleanout trip, which takes an average of 52 hours in this field, the RFID tools produced significant value in terms of time, cost and operational efficiency.

“This job was a perfect illustration of how team effort can produce results within an incredibly short timeframe,” said Nicole Carpenter, vice president and global account manager at Weatherford. “We look forward to applying these tools to future operations in this field.” 

Current News

SLB, OneSubsea and Subsea7 Sign Up for Wisting and Bay Du Nord Projects

SLB, OneSubsea and Subsea7 Sig

MODEC Completes GHG Emissions Quantification Project for FPSOs in Brazil

MODEC Completes GHG Emissions

Cyprus Seeks Improvements to Chevron-led Plans for Offshore Gas Field

Cyprus Seeks Improvements to C

Equinor Seeks to Revive Costly Norway, Canada Oil Prospects

Equinor Seeks to Revive Costly

Subscribe for OE Digital E‑News

Offshore Engineer Magazine