Quadrant starts at Phoenix South-2

Quadrant Energy has spudded the Phoenix South-2 well within the WA-435-P exploration permit in the North West Shelf of Australia.

Joint venture partner Carnarvon Petroleum said the well has been drilled down to approximately 1500m depth, and is currently setting the 508mm casing.

Once the casing has been set and cemented in place, the well will start drilling the 445mm hole.

The rig is expected to take between two to three weeks to complete the drilling of the hole down to a depth of approximately 3500m before running the 346mm intermediate casing.

No reservoir objectives are anticipated to be intersected in this hole section.

Quadrant holds 80% interest in WA-435-P, while Carnarvon has the remaining 20% stake.

Current News

Regal Rexnord Ensures Smooth Power for Offshore Energy

Regal Rexnord Ensures Smooth P

Cortec Keeps Offshore Energy Flowing

Cortec Keeps Offshore Energy F

Vard to Build Two CSOVs for Taiwanese Client

Vard to Build Two CSOVs for Ta

Noble Corporation Hooks $40M Contract for Noble Resolve Jack-Up

Noble Corporation Hooks $40M C

Subscribe for OE Digital E‑News

Offshore Engineer Magazine