Mooring Lines News

 

DNV GL releases offshore fiber rope RP

Nov 05, 2015

The results of two DNV GL led joint industry projects (JIPs) and a JIP pre-study commissioned by Statoil are now captured in a new Recommended Practice (RP) on offshore fiber ropes. With a system perspective on mooring performance, DNVGL…

Goliat FPSO mooring lines installed

Nov 03, 2015

Image: Eni Goliat illustration overview/Eni Lankhorst Ropes Offshore has overseen the installation of the mooring ropes for the Goliat FPSO (floating production storage and offloading) for Eni Norge…

Flintstone releases new mooring system

Oct 20, 2015

Flintstone Technology has launched its latest product, the pull through mooring connector system, which provides a method of connection and disconnection for mooring lines to midwater buoys or floating facilities.  The pull through connector…

Pulse wins NOV contract

Oct 06, 2015

Pulse Structural Monitoring (Pulse), an Acteon company, has been awarded a contract with National Oilwell Varco (NOV) Arendal in Norway to provide an acoustic mooring line subsea monitoring system to measure mooring line inclination and tension…

Taking on Papa Terra

Oct 01, 2015

The safe installation of the first tension-leg wellhead platform offshore Brazil could pave the way for future similar developments, says DNV GL’s Mike Roberts and David Ryan. Chevron’s Papa Terra facility offshore Brazil…

InterMoor completes Heidelberg hook-up

Aug 12, 2015

InterMoor provided Anadarko Petroleum Corp. with rapid hook-up services for their Heidelberg truss spar in the deepwater Gulf of Mexico after stepping in at short notice for another contractor. The company hooked up the 80,000 b/d spar to three mooring lines in Green Canyon block 860…

OTC15: SBM Offshore introduces ARCA

May 06, 2015

SBM Offshore released this video demonstrating its new ARCA (articulated rod connecting arm) chain connector. The ARCA won accolades at this year’s Offshore Technology Conference’s Spotlight on Technology Awards. SBM Offshore was…

InterMoor completes Equatorial Guinea project

Apr 23, 2015

InterMoor completed replacing critical components in an floating production unit (FPU) mooring system offshore Equatorial Guinea, enabling the prime contractor, Boskalis, to expand the InterMoor work scope. The Zafiro Producer…

North Sea mooring systems: How reliable are they?

Nov 01, 2014

Mooring failure rates are still higher than industry targets. Assessing past failures could help industry understanding, say Will Brindley and Andrew Cornley. The Blackford Dolphin semisubmersible mobile offshore drilling unit Images from DNV GL…

Deepest GoM decom job complete

Oct 30, 2014

InterMoor completed the decommissioning of Anadarko Petroleum Corp.’s Red Hawk spar in the Gulf of Mexico. Red Hawk spar being towed to reefing site. From InterMoor.   According to InterMoor…

Upgrading Benchamas

Jul 07, 2014

The Benchamas Explorer FSO locaed in the Gulf of Thailand. Photo from Chevron.  In order to improve mooring integrity, Chevron and Technip developed a plan to change out the mooring system at its Benchamas FSO off Thailand…

Delmar Quick Release - new mooring component

Jun 10, 2014

Based in Broussard, Louisiana, Delmar Systems Inc. develops innovative mooring solutions and has recently introduced the Delmar Quick Release (DQR). The DQR is an in-line mooring component with a simple mechanical release that allows…

Deep Sea Mooring backs new business

May 08, 2014

Norwegian mooring solutions and services firm Deep Sea Mooring (DSM) is backing a new, specialist business dedicated to subsea installation solutions. Deep Sea Installation (DSI), which will initially focus on the floating production, storage and offloading vessel segment…

InterMoor on GOM decom job

Mar 03, 2014

InterMoor has completed decommissioning operations of the Innovator platform in Gomez field, Mississippi Canyon Block 711, Gulf of Mexico. The scope of work, conducted in water depths of 910 m, involved disconnecting 10 risers/umbilicals…

Lankhorst ropes for Aasta Hansteen

Jan 23, 2014

Offshore rope manufacturer Lankhorst Ropes has been awarded a contract by HHITECH (Hyundai Heavy Industries and Technip USA consortium) to supply the mooring lines for Statoil’s Aasta Hansteen Spar platform. The platform is destined for the Norwegian Sea…

Current News

Talos Energy Makes Leadership Team Changes

Talos Energy Makes Leadership

SOVs – Analyzing Current, Future Demand Drivers

SOVs – Analyzing Current, Futu

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Equinor Cleared for Drilling O

Skanska Set for South Brooklyn Marine Terminal Buildout

Skanska Set for South Brooklyn

Subscribe for OE Digital E‑News

Offshore Engineer Magazine