Integration News

 

New CEO for Nexen Energy

Apr 24, 2014

Nexen Energy (wholly-owned subsidiary of CNOOC Ltd.) CEO, Kevin Reinhart (pictured) has announced his plans to retire after 20 years with the company. CNOOC Ltd. executive vice president, Fang Zhi will succeed Reinhart in this position. Zhi’s 30-year career with CNOOC Ltd…

OneSubsea ships 100th subsea tree

Mar 19, 2014

OneSubsea™ has shipped its 100th subsea tree from its manufacturing facility at Port of Tanjung Pelepas in Johor, Malaysia. The state-of-the-art facility has been operating since 2007 providing subsea wellhead systems, valves and trees across the globe…

First oil from Mars B field

Feb 04, 2014

A closer look at the integration and delivery of first oil in Mars B through the Olympus tension-leg platform.

Schlumberger introduces new surface multiphase flowmeter

Jan 16, 2014

Schlumberger released the Vx Spectra surface multiphase flowmeter, which enables operators to obtain flow rate measurements in production testing and permanent monitoring. The Vx Spectra 19mm monitors low-rate producing wells down to 30 b/d…

Intertek on Ichthys

Sep 18, 2013

Intertek has been awarded the dimensional control contract for INPEX Ichthys floating production storage offloading (FPSO) turret development.   The contract invoves the assurance and verification of fabrication and integration of the FPSO turret…

Schlumberger acquires Gushor

Aug 01, 2013

Schlumberger acquired Gushor Inc., a Canadian-based petroleum geochemistry and fluid analysis company that provides production and exploration solutions in the heavy oil and oil sand (HOOS) industry. Formed in 2006, Gushor specializes in the integration of geology…

Lamar McKay named chief executive of upstream at BP

Jan 10, 2013

BP has named Lamar McKay chief executive of upstream. He will lead the exploration, and developments and production divisions with the upstream strategy and integration team. McKay has spent 32 years with BP. Since 2009, he served as chairman and president of BP America…

Gordon Birrell new regional president of BP

Dec 07, 2012

Gordon Birrell BP head of safety and operational risk for Azerbaijan, Georgia and Turkey, is replacing Rashid Javanshir as regional president. Javanshir, who had run BP’s AGT operations since 2009, returns to London as SVP for strategy and integration.

Walk to work

Jul 19, 2012

The first phase of a contract to integrate a novel self-stabilising gangway system onboard the subsea construction vessel Island Enforcer, chartered to provide pedestrian access for workers from vessel to offshore platform as required, was recently completed by Babcock for Shell…

Åge Landro returns to AGR Field Operation

Jun 26, 2012

Åge Landro (pictured), former EVP of AGR Field Operation, has returned to the Norwegian group as EVP strategy & integration. Landro moved to Oceaneering in December last year when AGR completed its sale of the field operations business unit to Oceaneering.

Proserv

Apr 28, 2012

Proserv has opened a new facility in Aberdeenshire for subsea system integration testing, factory acceptance tests, tree assembly and BOP re-certifications.

Stephane Constant

Mar 03, 2012

Stephane Constant (pictured) has taken up the newly created, full-time post of CTO to lead the Xodus Group’s integration of surface and subsurface services. Constant worked as a reservoir engineer for Elf and Agip in the UK and Premier Oil…

Safetec Nordic

Jan 10, 2012

An ABS affiliate has entered into an agreement to acquire risk and asset management specialist Safetec Nordic, whose programs and services are expected to strengthen and expand those of ABS Consulting. ‘The integration of Safetec is directly…

Dropping downtime

Oct 26, 2010

Another drilling contractor, Seadrill, recently put to the test DNV’s new standard for managing integrated software dependent systems. Wendy Laursen assesses the system’s scope for reducing software-related downtime on drilling units.There are…

20:20 vision in sight

Feb 16, 2010

A new flow assurance solution promises improved accuracy as part of a next-generation integrated production management system and as a standalone engineering tool. OE looks at LedaFlow’s performance to date and future potential.At 143km, the…

Current News

Talos Energy Makes Leadership Team Changes

Talos Energy Makes Leadership

SOVs – Analyzing Current, Future Demand Drivers

SOVs – Analyzing Current, Futu

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Equinor Cleared for Drilling O

Skanska Set for South Brooklyn Marine Terminal Buildout

Skanska Set for South Brooklyn

Subscribe for OE Digital E‑News

Offshore Engineer Magazine