Technip gets Lula subsea gig

Tupi BV awarded Technip a contract to supply high technological flexible pipes for the Lula Alto pre-salt oil field off Brazil.

Map from Petrobras.
 

Lula Alto is an ongoing development located in the Santos basin, near Sapinhoa and Iracema, off Rio de Janeiro.  

The contract, estimated at more than US$560 million, includes Technip to supply around 200km of flexible pipes and associated equipment, including gas lift, gas and water injection, gas export and production lines. The company says that these high technological flexible pipes are designed to meet pre-salt challenges with water depths of up to 2500m and high pressures. Delivery is scheduled to begin in 2H 2015.

Technip’s Rio de Janeiro operating center will perform the project management and engineering. The flexible pipes will be produced at its manufacturing sites of Vitoria and Açu, Brazil.

Tupi BV is a consortium composed of Petrobras Netherland BV (PNBV, 65%), BG (25%) and Galp (10%).

In November, Petrobras said it would install a permanent 4D seismic monitoring system at the 1500sq km Lula field. Four-dimensional seismic encompasses time, in addition to the three dimensions of space, and is one of the most advanced technologies available to monitor oil fields.

Read more:

Petrobras plans 4D seismic over Lula field

Current News

Decarbonization Offshore O&G: Navigating the Path Forward

Decarbonization Offshore O&G:

US Offshore Wind: Outlook Strong Despite Construction Productivity Issues

US Offshore Wind: Outlook Stro

Bourbon Orders Exail Tech to Streamline Subsea Fleet’s Services for Offshore Energy

Bourbon Orders Exail Tech to S

Asso.subsea Wraps Up Subsea Cables Installation at French Floating Wind Pilot

Asso.subsea Wraps Up Subsea Ca

Subscribe for OE Digital E‑News

Offshore Engineer Magazine