VBMS completes umbilical installation

Published

VBMS completed a remote platform tieback project - platform L8-P4 to L6-B - for Wintershall Noordzee B.V. in the North Sea.

Image of the Ndurance. From Boskalis.

The scope of work for VBMS included the engineering, installation and burial of a 19.5km umbilical, at a water depth of 29m.

The L6-B platform is a remote tieback to L8-P4 in the L blocks in the Dutch sector of the North Sea, located approximately 30km northwest of Den Helder. The platform is the newest addition to the Wintershall offshore assets in this sector.

The J-tube pull-ins were performed directly from the Boskalis cable-laying vessel Ndurance using its quadrant system without any interruption or temporary lay-down of the umbilical. VBMS deployed a specialized burial vessel for the post-installation jet trenching. A follow-up as-laid survey of the umbilical route verified that the burial exceeded the requirements in order to ensure optimal protection of the umbilical.

Current News

Martens en Van Oord Purchases Autonomous Survey Vessel From Demcon unmanned systems

Martens en Van Oord Purchases

Mubadala Hires SLB for Deepwater Drilling Services Offshore Indonesia

Mubadala Hires SLB for Deepwat

Cydome Rolls Out Remote Cybersecurity Tool for Offshore Wind Farms

Cydome Rolls Out Remote Cybers

BW Offshore, McDermott Unveil Blue Ammonia FPSO Concept (Video)

BW Offshore, McDermott Unveil

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine