Stone ahead on Cardona

Laffayete, Louisiana-based Stone Energy is ahead of schedule on the deepwater Cardona development project in the US Gulf of Mexico.

The Cardona South well (MC 29 #4), located in Mississippi Canyon 29, is expected to begin initial production by 1 December 2014, six months after drilling. Stone believes gross production will reach an estimated 12,000 boe/d for both the MC 29 #5 and MC 29 #4 wells.

In February, Stone hit oil at the MC 29 #4 well using the ENSCO 8502 drilling rig, the same rig that is drilling MC 29 #5.

Stone Energy is the operator and has 65% interest of both Cardona wells.

Stone also announced that they acquired 40% working interest in the Noble Energy-operated Madison prospect located in Mississippi Canyon Block 479. The project is set to drill in 4Q 2014.

Image from Stone Energy

Read more:

Stone hits Cardona oil

Current News

Oceaneering Signs On for Terradepth's Ocean Data Service

Oceaneering Signs On for Terra

US Oil and Gas Production Rebounds

US Oil and Gas Production Rebo

Macquarie Asset Management to Sell Stake in UK Offshore Wind Farm

Macquarie Asset Management to

SMD Invests £300K in Clean Energy

SMD Invests £300K in Clean Ene

Subscribe for OE Digital E‑News

Offshore Engineer Magazine