Topaz orders two more Vard vessels

Published

Vard Holdings secured a contract worth about US$40 million for the design and construction of two additional module carrier vessels for Topaz Energy and Marine.

The vessels, of VARD 9 21 design and measuring 123m by 16.5m, are sister ships of a series of 15 identical module carrier vessels previously contracted by Topaz for delivery from Vard’s shipyards in Tulcea and Braila in Romania, and Vung Tau in Vietnam.

They will be operated by Topaz through a consortium led by Blue Water Shipping.

One of the additional vessels will be built at Vard Braila and one at Vard Vung Tau.

Delivery of both vessels is scheduled in Q2 2018.

Image from Vard.

Current News

Ndungu Full-Field Starts Up Offshore Angola

Ndungu Full-Field Starts Up Of

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

Norway's 2025 Oil Output Climb

AKOFS Offshore Inks New Vessel Deal with Petrobras

AKOFS Offshore Inks New Vessel

UK Trade Body Challenges Government View on North Sea Gas Decline

UK Trade Body Challenges Gover

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine